Opens in a new tab
Home / Services / Kitchen Renovations
Kitchen renovations · Burlington · Oakville · Mississauga

A kitchen designed around how you actually cook.

Layout changes, wall removals, custom cabinetry and stone counters, designed, permitted and built by one in-house team, with every material chosen in our Burlington design studio.

4.8★★★★★Google rating
350+Reviews on 4 platforms
8–14 wksTypical kitchen timeline

Plan your kitchen

Takes 60 seconds. Our team will call you to book your free consultation.

No obligation · We never share your details
Recognised & accredited by
Baeumler ApprovedRenoMarkBBB Accredited BusinessNKBA
★HomeStars 5.0
★Houzz 5.0
domilya GROUP kitchen project
domilya GROUP kitchen detail
8–14weeks from demolition to completion for most kitchens
Why domilya for your kitchen

Most kitchen problems are layout problems. We start there.

Not enough counter between the sink and the stove. An island that blocks the fridge. A wall that cuts the kitchen off from everyone else. New cabinet doors won't fix any of that, so every project starts with how you cook, store and gather, and a 3D plan you can walk through before anything is ordered.

If the right layout means moving a wall, our structural engineers assess it and design the beam. If it means moving the sink or range, our plumbers and electricians are on the same team. You deal with one project manager the whole way.

  • ✓3D renderings before you commit
  • ✓Structural engineers on our team
  • ✓Permits & inspections handled
  • ✓Materials chosen in our showroom
Our commitments

In writing, on every project.

Promises are easy to make on a website. These go into your contract.

01

Line-item quote

Every cost itemised before we start, so you know where the money goes.

1-yr

Workmanship warranty

Any defect in our workmanship, or in materials we supplied, is fixed at our cost for a full year after completion. It's written into your contract.

1

Project manager

One person, one phone number, from first design to final walkthrough.

100%

Permits handled

Structural, plumbing and electrical permits, and every inspection.

What we build

From a full gut to the finishing details.

See kitchen projects →
Full gut & rebuild
01Most requested

Full gut & rebuild

Stripped to the studs and redesigned: new layout, plumbing, electrical, cabinetry, counters, flooring and lighting.

Open concept conversions
02

Open concept conversions

Walls removed, beams engineered, and the kitchen opened up to the living space.

Custom cabinetry
03

Custom cabinetry

Soft-close, sized to your space and built to the ceiling.

Islands, counters & backsplash
04

Islands, counters & backsplash

Waterfall quartz, granite and marble islands with seating, storage and built-in appliances, professionally templated and installed.

Before & after

Same house. Different life.

Drag the slider to see what we started with. Every photo on this page is from a real domilya GROUP project.

Oakville kitchen, gutted to transitional whiteDesign, permits and construction by domilya GROUP
After: Oakville kitchen, gutted to transitional whiteBefore: Oakville kitchen, gutted to transitional white
⇆
BeforeAfter
Your investment

Every kitchen is different. So is every quote.

We don't sell packages. Your price is built around your layout, your cabinetry and your finishes, and you see every line of it before work starts.

Get your custom quote →
01

Layout changes

Keeping the footprint, or moving the sink, range or walls.

02

Walls & structure

Load-bearing walls need an engineered beam and a permit.

03

Cabinetry

Custom sizing, height to the ceiling and interior storage fittings.

04

Countertops

Quartz, granite, marble or porcelain, plus edge and waterfall details.

05

Appliances & venting

Built-in or pro-style appliances and the hood and circuits they need.

06

Finish level

Flooring, lighting, hardware and backsplash selections.

1Free consultation
2Design & material selections
3Detailed line-item quote, no surprises
domilya GROUP kitchen project
domilya GROUP kitchen project detail
domilya GROUP kitchen project detail
Pictured: another domilya GROUP kitchen, Milton
Client story

A busy family's kitchen, finished in three weeks.

Two working parents with a busy family needed their kitchen back quickly. Our designer worked through the layout, cabinetry and budget with them, and our crew finished the full renovation in three weeks, briefing them at the end of each day and cleaning up the work area every night.

Timeline3 weeks, no delays
ScopeFull kitchen, new cabinetry
DesignWith our in-house designer
UpdatesDaily, in person
“Our entire kitchen renovation was completed in three weeks, no delays… I was at work all day and when I came home they gave me a full briefing.”
— HomeStars client
How it works

Five steps, zero guesswork.

You always know what happens next, who's doing it and what it costs.

1
Week 1

Free consultation

We visit, measure, look at how your kitchen works today and talk through your goals and budget.

Honest feasibility
2
Before you commit

Design & 3D renderings

Layout options, 3D renderings, cabinetry and material selections in our showroom, and a line-item quote.

3D plan + line-item quote
3
Before we build

Permits & ordering

Permits for structural, plumbing or electrical work. Cabinets and counters ordered early so they arrive on schedule.

Locked-in schedule
4
8–14 weeks

Construction

Demolition, structure, plumbing, electrical, cabinetry, counters, backsplash and finishes, run by your project manager.

Regular progress updates
5
Handover

Final walkthrough

We go through every drawer, appliance and finish with you. It isn't done until you sign off.

Written warranty
domilya GROUP project
Our Burlington design studio

See it, touch it, then choose it.

Choosing a countertop from a small sample online is how kitchens go wrong. At our design studio on South Service Road in Burlington, you make your selections with your designer, next to the real materials.

CountertopsQuartz, granite, marble and porcelain
BacksplashGlass tile, stone mosaic, marble and more
SinksFarmhouse, undermount and everything between
LightingPendants, recessed lighting and sconces
FlooringHardwood, stone tile and luxury vinyl
TileDesigns sourced from around the world
Visit us: 4380 South Service Rd, Unit 11, Burlington, ON L7L 5Y6 →Mon–Fri 9am–5pm · Sat by appointment
Client reviews

What kitchen clients say.

350+
★★★★★
reviews · 4.8 Google · 5.0 HomeStars & Houzz · 4.9 TrustedPros
★★★★★
“

Everyone from the design team to the demo crew to the trades were all so pleasant, respectful and hard working (and clean!!) They went above and beyond in all aspects of the job.

A
Ashley G.Kitchen & main floor
HomeStars
★★★★★
“

Our family of 4 lived through the renovations, so we were particularly thankful that the team at domilya GROUP worked quickly and also cleaned very quickly!

H
HomeStars clientEat-in kitchen & main floor
HomeStars
★★★★★
“

We woke up this morning and went downstairs to make coffee in a wonderful new kitchen… Kathy's summation was “makes you wonder why we waited so long to update the kitchen.”

K
Keith & KathyKitchen renovation
HomeStars
FAQ

Kitchen Renovations questions.

Can't find your answer? Our team is happy to talk it through, with no obligation.

Ask a question →
How much does a kitchen renovation cost?

It mostly comes down to three things: whether the layout changes, the cabinetry you choose and your countertop material. Moving a wall or relocating plumbing adds structural and permit work, while keeping the footprint keeps costs down. After your free consultation you get a detailed line-item quote, so you can see exactly where the money goes and adjust before anything is ordered.

How long does a kitchen renovation take?

Most kitchens take 8–14 weeks from demolition to completion. Custom cabinetry and stone lead times are the biggest variables, which is why we order early and give you a detailed schedule before demolition starts.

Can I stay in my home during a kitchen renovation?

Most clients do. We close off the work area to contain dust and clean up at the end of every day. Many families set up a simple temporary kitchen elsewhere in the house, and we order cabinets and counters early so you're without a kitchen for as short a time as possible.

Do I need a permit for a kitchen renovation?

Replacing cabinets and counters in the same layout usually doesn't need a building permit. Removing or altering walls or moving plumbing generally does, and new electrical work needs an ESA permit. We tell you what your project needs at the consultation and handle the drawings, permits and inspections.

Can you remove a wall to open up my kitchen?

Yes. Open concept conversions are one of our most requested projects. Our structural engineers check whether the wall is load-bearing and design the beam, and the work is permitted and inspected.

What areas do you serve?

We're based in Burlington and work across Oakville, Milton, Mississauga, Etobicoke, Waterdown, Ancaster, Dundas, Georgetown, Halton Hills and Guelph. Free in-home consultations are available throughout our service area.

Free consultation

Sit down with the person who'll design your kitchen.

A designer visits your home, measures the space and talks through layout options. You leave with a clear idea of cost and timeline, with no pressure to commit.

Heba, co-owner of domilya GROUP
ShannonKitchen & Bath Designer, Domilya Group
“A kitchen is more than just a place to cook. It’s where everyday routines unfold, families come together, and memories are made. Thoughtful, curated design lies in the details. From the layout, storage, lighting and material selections, every element plays a role in creating a space that is both beautiful and functional”